1. Complete parts list
Record part names, counts, dimensions, fragility and any sharp, heavy or easy-to-lose component.
Small model and building-kit brands
Make every component easy to count, protect and understand. Build the box, bags or partitions, instruction sheet, labels and dispatch outer around one verified packed layout.

Record part names, counts, dimensions, fragility and any sharp, heavy or easy-to-lose component.
Map bags, trays, partitions, cards or labeled zones so parts can be checked and unpacked in sequence.
Define sheet size, folds, language, diagrams, version number and where the instructions sit in the opening order.
Choose a mailer or presentation box from the finished packed layout, not the unassembled component dimensions.
Coordinate kit name, variant, batch or part labels, warning text and brand artwork without obscuring required information.
Assess movement, abrasion, crushing and drop exposure, then record the approved pack-out and carton facts.
A dieline or attractive box does not confirm that every part fits or arrives in order. First make a physical packed mock-up, photograph each layer, verify component counts and define acceptable movement. Safety, age grading or market-specific labeling remains the brand owner's responsibility and should be included in the brief.

A small stock format for testing a compact kit layout before developing custom print or a larger structure.

A review-first direction for flatter parts, instructions and boards; usable internal fit must be confirmed.

A presentation-led option for premium kits when internal organization and a suitable delivery outer are specified.
Calculate a minimum internal mailer target from the packed mock-up, then confirm it with a physical sample.
Provide the component list, packed layout, fragile parts, finished dimensions, weight, labeling needs, destination and quantity.
Yes, after their material, layout, print files, part retention, proof route and assembly steps are reviewed.
No. Packed fit, movement, stacking, abrasion and drop risk need appropriate prototype validation.
Build the first brief privately, then send the layout and facts you want reviewed.